Mongolia, especially Ulaanbaatar, is geographically restricted, with its rugged mountain range and limited air routes. The NUBIA project was originally required to be implemented by the very small airport and very small aircraft. The airport operates in all sorts of information, technologies, and reliable networks. In collaboration with Big Ti Co., a large subcontractor of the Government of Mongolia, SAMTUNG CY and A, the company has successfully introduced an adjudication system, telephone system and cable network to the airport.
© 2017 ITZONE INTERNATIONAL PTE. LTD